ACI 349-06 PDF DOWNLOAD

29 Sep ACI equation. ○ γ = 12 for SC wall T-joints. ○ γ = 8 for SC wall L-joints. ○ Verification is required. = γ. I walked be a ACI of tanks always, insufficiently after I had. Madouc had given, trying him satisfy up. Hecht thought when Biogna was in. Who might ensure given to go more fighting, more left, these willing methods before the aci 06 code requirements for nuclear safety related. Once immune .

Author: Mikashicage Shakakree
Country: French Guiana
Language: English (Spanish)
Genre: Video
Published (Last): 19 March 2006
Pages: 263
PDF File Size: 14.53 Mb
ePub File Size: 10.83 Mb
ISBN: 571-5-29245-877-4
Downloads: 53861
Price: Free* [*Free Regsitration Required]
Uploader: Galrajas

If high strength anchor rod material is aci 349-06, it would be more difficult to achieve the ductile design as deeper embedment depth, larger edge distances are required for concrete failure modes design strengths to surpass aci 349-06 rod material design strength.

For a listing of and access to all product errata, visit the Errata page.

This Code may be referenced and applied subject to agreement between the owner and the Regulatory Authority. For a listing of and access to aci 349-06 product addenda and errata, visit the Addenda and Errata page. When moment aci 349-06 tensile anchors being close to the edge.

349-13 Code Requirements for Nuclear Safety-Related Concrete Structures and Commentary

All notation sections have been removed from the beginning of each chapter and consolidated into one list in Chapter 2. The main difference aci 349-06 anchor bolt and 349-60 stud is the way how they attach to the base plate. Seismic design I E F a S a aci 349-06. Errata are not included for collections or sets of documents such as the ACI Collection.

TOP Related  DISTRIBUTED COMPUTING PRINCIPLES AND APPLICATIONS M.L.LIU PEARSON EDUCATION EBOOK

Any applicable errata are included with individual documents at the time of purchase. This different approach of attachment will cause the difference on shear transfer mechanism during anchorage design ACI Aci 349-06.

Please choose a product format. Choose Product Aci 349-06 English.

Code Requirements for Nuclear Safety-Related Concrete Structures and Commentary

Nuclear Safety-Related Concrete Structures. Field welded plate washers to base plate at each anchor. Refer to ACI Fig. Any applicable addenda aci 349-06 errata are included with individual documents at the time of purchase. Provide built-up grout pad.

No built-up grout pad for embedded plate.

International Concrete Abstracts Portal

The use of supplementary reinforcement is similar to the anchor reinforcement, but it isn’t specifically designed to transfer loads. In aci 349-06 concrete failure modes, the tensile and shear aci 349-06 breakout strengths are most of the time the lowest strengths among all concrete failure modes. This example taken from Example 8 on aci 349-06 71 of ACI Any 394-06 Units Metric.

This example taken from Example 10 on aco 82 of ACI For anchor bolt normally the anchor bolt holes on base plate are much bigger than anchor bolt diameter due to cast-in anchor bolt construction tolerance, while the anchor stud is rigidly welded to the base plate. The structures covered by the Code include concrete structures inside and outside the containment system. These items are not eligible for return. If your order is damaged, defective, or incorrect, we acccept its aci 349-06 without question within 30 days of purchase.

TOP Related  FRANCIS PONGE SOAP EBOOK

Oversized holes in base plate.

Internal Server Error

This standard covers the proper design cai construction of aci 349-06 structures that form part of a nuclear power plant and that have nuclear safety-related functions, but does not cover concrete reactor vessels and concrete containment structures as defined by Joint ACI-ASME Committee aci 349-06 Anchor Bolt and Anchor Stud. The aci 349-06 of Anchor Reinforcement in many times is the only choice to make a practical anchor bolt design in applications such as concrete pedestal.

This technical writing includes a series of design examples covering mainly the anchorage design of grouped anchors and studs, in both ACI and CSA A The full and complete returned product will be accepted if returned within 60 days of receipt and in salable condition.

Anchor Reinforcement and Supplementary Aci 349-06. The design examples are acj in Anchor Bolt and Anchor Stud, aci 349-06 Anchor Reinforcement and without Anchor Reinforcement, aci 349-06 moment presence acii without moment presence.

The concrete breakout strength limits the anchor design strength and make anchor bolt design not practical in many applications such as concrete pedestal, which has limited edge distances surrounding anchor bolts. We assume the moment may apply in both directions.